On the morning of March 30th at 0824 hrs ATFD units were dispatched to a cabinet shop for smoke coming from the structure.  Upon arrival, C-shift found a working attic fire and a structure with containing a heavy fire load.  The fire was quickly contained and damage limited primarily to the attic area.